´╗┐Arizona Corporation Commission Workshop Fourth Biennial Transmission Assessment 2006 - 2015 Robert Kondziolka Salt River Project Manager of Transmission Planning June 6, 2006 Phoenix, Arizona

Slide 2

Contingency Planning (N-1-1) For Palo Verde Transmission System Pre-2006 Summer Season Facilities Out of Service: Fall 2005-June 1, 2006 PaloVerde-Devers, Hassayampa-N.Gila, N. Gila- Imperial Valley 500kV Lines;4 Series Capacitors Banks and Westwing 500/230kV Transformer #4 Out of Service Maximum Scheduling Generation Capacity: 6,107 MW (Will Meet the Expected Power Transfer Need)

Slide 3

Contingency Planning (N-1-1) For Palo Verde Transmission System Pre-2006 Summer Season Facilities Back Into Service:- After June 1, 2006 PaloVerde-Devers, Hassayampa-N.Gila, N. Gila- Imperial Valley 500kV Lines;4 Series Capacitors Banks and Westwing 500/230kV Transformer #4 Back into Service Maximum Scheduling Generation Capacity: 7,457 MW (Will Adequately Meet Power Transfer Requirement)*

SPONSORS