Part 9. Roadway Design for Rideability

0
0
2276 days ago, 970 views
PowerPoint PPT Presentation
Section 9. 2. 9.1 Factors in Pavement Design. Targets of 9.1

Presentation Transcript

Slide 1

Section destinations secured by CE361: By the finish of this part the understudy will have the capacity to: Chapter 9. Parkway Design for Rideability Explain the impact that dirt has on asphalt quality Determine the stacking that vehicles apply on the roadway asphalt framework Design an area of adaptable asphalt Evaluate cost exchange offs between material properties and the thickness of asphalt layers Discuss asphalt administration issues and the requirement for asphalt repair Chapter 9

Slide 2

9.1 Factors in Pavement Design Objectives of 9.1 & 9.2 List the parts in an asphalt framework List the variables that influence asphalt configuration Describe the effects that trucks have on asphalts Explain stack equivalency elements Identify truck sorts by pivot setups By the finish of this segment, the understudy will have the capacity to... Part 9

Slide 3

9.1 Factors in Pavement Design 9.1.1 History – Read 9.1.2 Two sorts of asphalts Chapter 9

Slide 4

9.1.3 Measuring asphalt quality Measured by Rideability (or solace to the rider) and Visual perception of flaws (troubles, for example, breaking, rutting, and pushing) PSI (display serviceability list 0 - 5) – surrogate for PSR by physical estimation PSR (show serviceability rating 0 – 5) – subjective rating by master raters. Terminal serviceability list (TSI) PSI = 2.0 to 2.5 (inadmissible ride quality) For relationship amongst PSR and PSI, see: http://nersp.nerdc.ufl.edu/~tia/5837-2.pdf For PSI, check this site. It's exceptionally enlightening: http://training.ce.washington.edu/WSDOT/Modules/09_pavement_evaluation/09-6_body.htm Chapter 9

Slide 5

IRI (International Roughness Index) – measure of unpleasantness inches/mile or meters/km – ride-based which is straightforwardly a component of asphalt misery – breaking, fixing, and so forth. An IRI more than 120 in/mi shows time for restoration and relates to a PSI of around 2.2. Part 9

Slide 6

9.1.4 Soil attributes – Read and check Table 9.2 for general soil qualities (What sort of soil would you like to have as subgrade?) M r : Modulus of versatility = the versatile properties of soil is utilized as a part of adaptable asphalt thickness outline When CBR (California bearing proportion) < 6, M r ≈ 1500 x CBR M r has occasional changes (p. 465) – see the following page. This outline was excluded in the course reading. Need to decide a yearly normal M r to use in asphalt plan. This subject is shrouded in detail in CEEn563, educated by Dr. Guthrie. Part 9

Slide 7

Environment Step 1 Temperature and precipitation influence the level of quality of the subgrade, thought about the estimation of strong modulus. AASHTO built up an outline that helps you to assess the compelling roadbed soil flexible modulus utilizing the serviceability criteria (as far as "relative harm, u f .") Determine the normal u f . esteem and acquire M r from the diagram or the condition of u f . . The bar on the privilege is utilized twice: Once to peruse u f esteem for every month's example M r , then to peruse yearly normal M r utilizing the normal u f esteem. Step 2 Step 3 Chapter 9

Slide 8

9.2 Determining Loads from Truck Traffic Truck movement is the real reason for asphalt harms. Furthermore, truck stacking is changed over to ESALs (identical single-pivot burdens) for asphalt thickness outline (the AASHTO plan strategy) The goal is to gauge the ESALs that will bring about a corruption of the PSI to 2 or 2.5 from its underlying estimation of 4.5 to 5. The yearly ESALs are computed from the normal blend of day by day truck activity and summed for the year. Section 9

Slide 9

9.2.1 Determining proportional single-pivot load Read 9.2.2 and 9.2.3. Part 9

Slide 10

9.2.4 Determining lifetime ESALs for asphalt plan This resembles ascertaining a future estimation of a progression of yearly installments with loan cost, g. (see p. 262 Figure 5.4 of the content for the recipe) AnnualESAL N years: plan skyline Future aggregate ESAL We will stroll through Examples 9.1 and 9.2. Section 9

Slide 11

9.3 Flexible Pavement Design 9.3.1 The AASHTO Road Test Read to know the historical backdrop of the AASHTO adaptable asphalt thickness outline recipe, Done in Ottawa, Ill. 1950 - 1962 9.3.2 Materials for black-top asphalts Asphalt solid (surface layer): Must oppose distortion from burdens Be slip safe (notwithstanding when wet) Be impenetrable to most climate and deicing chemicals Chapter 9

Slide 12

9.3.3 Pavement layers and the auxiliary number Chapter 9

Slide 13

Structural number of an asphalt SN mirrors the aggregate asphalt thickness, including the capacity of the dirt or subgrade to give adequate strength amid the rehashed loadings to keep up the sought serviceability (PSI). a 1 , a 2 , a 3 = coefficients of relative quality per inch d 1 , d 2 , d 3 = thickness in inches, d1 being surface layer m i = modifiers for more than typical measures of dampness, m i = 1.0 unless generally determined (Table 9.6) hma = hot blend black-top Chapter 9

Slide 14

Definition of seepage quality and finding prescribed m i values Time required to deplete the base/subbase layer to half immersion of free water. Step 1 If "Reasonable" and 30% presentation, then m i is 0.80. Step 2 Chapter 9

Slide 15

9.3.4 Fitting the plan factors together The properties (i.e. layer coefficients in the condition above) of each layer assumes a noteworthy part in deciding the thickness of each layer. Once the required auxiliary number of an asphalt area is resolved, the layers are processed by utilizing the AASHTO layered investigation technique. It is accepted that the basic limit of the asphalt is the whole of the auxiliary limit of each of its layers. Part 9

Slide 16

Simplify this as f(W 18 ) = f(Z R S o ) + f(SN) We will keep the ESAL esteem (W 18 ) steady and attempt to demonstrate whether Z R must be negative or not (p480). Take note of that S o and SN are constantly positive. Standard deviation is constantly positive since it is a physical distinction from the mean esteem, and SN is likewise positive since it infers asphalt thickness. ESAL is an expected esteem. It might quite or less. In the outline equation, in any case, the ESAL esteem is set to a steady. At that point, to ensure the asphalt survive, you need to have a thicker one than the thickness that the evaluated ESAL requires. To get that going in the plan recipe, we have to subtract an incentive from the RHS. Thus, the dependability consider must be negative (see Table in Step 1 in page 480). The best way to make Z R S o a subtraction is to have a negative estimation of Z R since S o is constantly positive. Consequently f(SN) must be greater to compensate for any shortfall, bringing about bigger SN required. S 0 2 represents the shot variety in the activity estimate and the possibility variety in real asphalt execution for a given outline period movement, W 18 . Part 9

Slide 17

Pivot pt. Nomograph for the AASHTO adaptable asphalt plan strategy Finding SN for base course, subbase, & subgrade (see p.480, 482). Information for point D. Mr of subgrade thought to be 5000 psi Chapter 9

Slide 18

9.3.5 Performing the layered examination Once the general basic number for the asphalt has been found, the layered investigation to discover the thickness of every asphalt layer can start. an i and m i values for the layers must be resolved given material quality ( M r ) and waste attributes information Must meet least thickness gauges Chapter 9

Slide 19

Structural layer coefficients ( an i ) Asphalt Concrete, a 1 Chapter 9 Granular base layer for untreated, a 2

Slide 20

Structural layer coefficients (cont) Cement-treated base, a 2 Subbase, a 3 Chapter 9

Slide 21

Determining m i values ( m i = 1 unless generally indicated) Time required to deplete the base/subbase layer to half immersion. Step 1 If "Reasonable" and 30% presentation, then m i is 0.80. Step 2 Chapter 9

Slide 22

Problem 9.11 for instance Chapter 9

Slide 23

Example 9.4: Pavement Design Alternatives We will stroll through this case, and you should read it before you come to class. Case 9.4 demonstrates to you how we can limit the cost of asphalt development, while meeting SN prerequisites, by adjusting layer thicknesses. Part 9

Slide 24

9.5 Pavement Management System PMS = All the exercises required in the arranging and programming , outline , development , support , and restoration of the asphalt bit of an open works program Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA 91) required all States to have a PMS that secured all Federal-Aid parkways; however this prerequisite was cancelled in 1995. 1990 AASHTO Guidelines for PMS "A Pavement Management System is intended to give target data and helpful information for investigation so that thruway supervisors can make reliable, financially savvy, and solid choices identified with the conservation of an asphalt arrange." (see Figure 9.35 for a case. See next page of this course notes.) Chapter 9

Slide 25

Chapter 9

Slide 26

Three parts of a PMS database which contains, as a base, the information required for PMS examination: investigation strategies to create items helpful for basic leadership: and, criticism handle which utilizes continuous field perceptions to enhance the unwavering quality of PMS examination. Part 9

Slide 27

A great database is the key of PMS Chapter 9

Slide 28

Data accumulation segments Inventory: physical asphalt highlights including the quantity of paths, length, width, surface sort, utilitarian order, and shoulder data History: extend dates and sorts of development, remaking, restoration, and preventive upkeep, and their costs Condition overview: harshness or ride, asphalt trouble, rutting, and surface grating Traffic: volume, vehicle sort, and load information Data base: aggregation of all information records in the PMS (see Table 9.12 for a specimen database) Chapter 9

Slide 29

Analysis Components Condition investigation : r

SPONSORS