National Adjustment of 2011 NA2011 Larry Signani

0
0
1569 days ago, 572 views
PowerPoint PPT Presentation

Presentation Transcript

Slide 1

National Adjustment of 2011 (NA2011) Larry Signani

Slide 2

VELOCITIES

Slide 7

West Coast Crustal Motion Horizontal speeds in the western U.S. in respect to the North American Datum of 1983 as got from geodetic perceptions. - Times 8 years (2002-2010) - As will be seen acknowledged with NAD 83(2011)Epoch2010 (tent. name) Slide from R. Snay, NGS

Slide 8

List of contractions utilized CONUS Conterminous United States CORS Continuously Operating Reference Stations FGDC Federal Geographic Data Committee GNSS Global Navigation Satellite System GPS Global Positioning System HTDP Horizontal Time Dependent Positioning (NGS programming) IGS International GNSS Service MYCS Multi-Year CORS Solution Epoch A n age is a minute in time utilized as a source of perspective point.

Slide 9

List of shortened forms utilized NA2011 National Adjustment of 2011 NAD 83 North American Datum of 1983 NAVD 88 North American Vertical Datum of 1988 NADCON North American Datum CONversion (NGS programming) NGS National Geodetic Survey NGSIDB National Geodetic Survey Integrated Data Base OPUS Online Positioning User Service

Slide 10

CORS NETWORK The National Geodetic Survey (NGS) works the Continuously Operating Reference Station (CORS) Network that gives Global Navigation Satellite System (GNSS) information in RINEX design, and related positions. At present NGS gives these directions in ITRF00 age 1997.00, and in NAD 83(CORS96) age 2002.00. NGS has finished a full reanalysis of all information from CORS and an arrangement of worldwide destinations with the objective to process a completely predictable arrangement of directions, GPS satellite circles and Earth Orientation Parameters (EOP). This underlying Multi-Year CORS (MYCS1) exertion is the first of an arrangement reprocessing ventures that will happen occasionally in the coming years.

Slide 12

REGIONAL CORS NETWORK

Slide 13

Slide by J. Griffiths and the MYCS Team

Slide 14

Why is NGS doing a national change a minor 4 years after the last modification

Slide 15

Why Reprocess? 1) Mixed directions from a before arrangement (1994-2002) that utilized just 3-8 ITRF reference outline locales to adjust to the worldwide casing 2) Mixed even speeds: demonstrated from HTDP versus figured 3) Mixed vertical speeds, which for huge numbers of the NAD 83(COR96) age 2002.00 stations are allocated an estimation of 0 mm/yr 4) NGS's present worldwide casing is ITRF00 age 1997.00; anticipating positions 13 years to the present is improbable 5) NGS's present plate-altered casing is NAD 83(CORS96) age 2002.00; anticipating positions 8 years to the present is additionally faulty 6) Implementing critical changes to existing preparing calculations and models incorporating consistence with IERS traditions (i.e. programming changes) 7) Switching from utilizing relative reception apparatus alignment to supreme recieving wire adjustments 8) The present best in class full (~230 stations) worldwide reference outline: IGS08 age 2005.00 Given these significant irregularities and changes, NGS chose to reprocess all its CORS information to give a solitary reliable arrangement of directions for all locales processed utilizing the best accessible strategies.

Slide 16

Why Reprocess? By and large we can't keep on living in age 2002 Generate completely steady circles, station facilitates utilizing most recent models and techniques longer information traverses outright radio wire alignments satellite transmitting and ground accepting recieving wires new system plan—included excess Delaunay triangulation over worldwide locales and CORS spine attach remaining CORS to spine as stars IERS 2003 Conventions for the most part executed upgraded demonstrate for station removals because of sea tidal stacking overhauled models for troposphere spread defers utilize ebb and flow outline; first endeavor to acquire a full history of items in a completely reliable structure. Contribute NGS reprocessed circles, to International GNSS Service (IGS) Slide by J. Griffiths and the MYCS Team

Slide 17

What is the aim of the venture and what is it accurately called? The venture is authoritatively called the "National Adjustment of 2011" , shortened as NA2011 . It is an across the nation, geometric change of aloof stations with positions decided utilizing Global Navigation Satellite System (GNSS) innovation and information, which incorporates the Global Positioning System (GPS). NA2011 is called "geometric" in light of the fact that it will yield new values for scope, longitude, and ellipsoid stature; it won't influence the orthometric statures of stations. In any case, a future across the nation vertical alteration is being considered to decide GNSS-inferred orthometric statures in view of the consequences of NA2011

Slide 18

A Little History " Multi-year' exertion started 5 years back IGS proposed re-preparing all information to re-process station directions, circles and EOPs from 1994-display MYCS positions were gotten from the reprocessing of the full 16 year time arrangement (1994-2010) and a thorough stacking of week by week evaluates in a completely predictable, worldwide system. 33 of these MYCS stations are in Washington NAD 83(2011)Epoch2010 is another acknowledgment of NAD 83 in light of this NGS Multi-Year CORS Solution (MYCS)

Slide 19

"multiyear" "Multiyear" exertion started 5 years prior •Began with an update of PAGES and handling methodology driven by frail NGS circle commitment to IGS. •IGS proposed re-preparing all information to re-process station directions, circles and EOPs from 1994-exhibit • Richard Snay gave assets and dealt with the exertion of the "multiyear" exertion till May 2010

Slide 20

What has changed between NAD 83(2011) age 2010.00 and NAD 83(CORS96) age 2002.00? There has been no datum change, that is, the cause, scale and introduction of NAD 83(2011) are indistinguishable to those of NAD 83(CORS96). The adjustments in directions are driven by various variables including the change to outright recieving wire alignments, new/reexamined handling calculations, enhanced intermittence recognizable proof, longer information sets, and our enhanced meaning of the worldwide reference outline. However for the end client the greatest change is created by the new reference age, which has changed by 8 years from 2002.00 to 2010.00. To show how little the adjustment in reference edges is, we look at the directions of all CORS locales with over 2.5 years of information at a similar age of 2002.00 in both casings:

Slide 21

WHAT IS THE SCHEDULE In July 2011 , NGS will finish a reanalysis of memorable Continuously Operating Reference Station (CORS) information, in conjunction with a universal exertion composed by the International GNSS Service (IGS). This reanalysis, known as the Multi-Year CORS Solution (MYCS) , will yield new geometric directions and speeds on CORS. For NGS items and administrations to be commonly adjusted, it is important to play out an alteration (compelled to the new MYCS directions) of whatever number GNSS vectors held in the NGS Integrated Data Base (NGSIDB) as could be expected under the circumstances. These vectors speak to GNSS perceptions between latent stations, and, critically, between aloof stations and CORS (i.e., dynamic stations). The vectors attached to CORS will make it conceivable to decide new organizes on uninvolved control that are predictable with the MYCS.

Slide 22

When will NA2011 be finished? The objective is to finished and distribute the outcomes before logbook year's over 2011, which additionally incorporates redesigning every influenced Ng items and administrations. There are various specialized and strategic difficulties in executing a venture of this greatness, and it is hard to appraise the time important to finish all the required assignments. In view of this, NGS has not set a particular date for consummation of the venture. This will rather be represented by meeting criteria for quality and fulfillment, both for the modification itself and its usage.

Slide 23

Will these avoided stations stay on pre-NAD 83(2011) age 2010.00 for endlessness? The answer is completely reliant upon whether a satisfactory GNSS study is ever performed at that uninvolved control stamp. For non-GNSS (i.e., "traditionally" decided) control, the most exact approach to decide facilitates reliable with an advanced acknowledgment of NAD 83 is to resurvey it utilizing geodetic quality GNSS information. The planned utilization of this position will figure out if an OPUS arrangement is adequate or if a total GNSS study submitted to NGS for distribution is required.

Slide 24

What are "aloof" and "dynamic" control stations? I'm not acquainted with the wording. A latent station is, in NGS wording, an ordinary" ground station , e.g., a metal circle set in a generous structure, a steel bar driven vertically into the ground until refusal, or other such stable physical imprints that can be involved with review gear. A dynamic station is a GNSS recieving wire (and related recipient) in a settled area giving GNSS information to the general population, for example, a CORS,WSRN

Slide 27

Frame Definition and Nomenclature ITRF outline (worldwide) multi-method—vlbi, slr, doris, gnss IGS outline (worldwide) GNSS just NAD outline (plate altered) identified with ITRF Critical to pay consideration on frametags and age dates and radio wire adjustment values Frame Name Epoch Antenna PCV* Data Duration ITRF2000 1997.0 RelANTEX 1994.0-2002.0 ITRF00 (NGS'ssoln) 1997.0 RelNGS ANTEX 1994.0-present NAD 83(CORS96) 2002.0 RelNGS ANTEX 1994.0-present ITRF2008 2005.0 Abs IGS05 ANTEX 1997.0-2009.5 IGS08 2005.0 Abs IGS08 ANTEX 1997.0-2009.5 IGS08 (NGS's tentative)2005.0 Abs IGS08 ANTEX 1994.0-2010.5 (continuous) NAD 83(2011) (tentative)2010.0 Abs I

SPONSORS