Cases of Variable Speed Limit Applications

0
0
2554 days ago, 816 views
PowerPoint PPT Presentation
2. Foundation. This report was readied for use at the Speed Management Issues Workshop (1/9/2000) as a major aspect of the Transportation Research Board 79th Annual Meeting.This record was readied by Mark Robinson, P.Eng., of SAIC for US DOT as a component of an undertaking request contract on Rural Intelligent Transportation Systems (DTFH61-98-C-00073).The after pages give a prologue to Variable Speed Lim

Presentation Transcript

Slide 1

Cases of Variable Speed Limit Applications Speed Management Workshop January 9, 2000 TRB 79th Annual Meeting

Slide 2

Background This report was set up for use at the Speed Management Issues Workshop (1/9/2000) as a component of the Transportation Research Board 79th Annual Meeting. This archive was set up by Mark Robinson, P.Eng., of SAIC for US DOT as a component of an assignment arrange contract on Rural Intelligent Transportation Systems (DTFH61-98-C-00073). The accompanying pages give a prologue to Variable Speed Limit (VSL) frameworks and give particular cases of household and outside uses of VSL. This rundown of illustration applications is not intended to be complete and may not be completely refreshed. Data on extra VSL frameworks and additional data on frameworks examined would be invited and can be sent by email to mark.d.robinson@saic.com

Slide 3

Table of Contents

Slide 4

Introduction to VSL frameworks are a sort of Intelligent Transportation System (ITS) that uses movement speed and volume recognition, climate data, and street surface condition innovation to decide suitable rates at which drivers ought to travel, given ebb and flow roadway and activity conditions. These admonitory or administrative paces are typically shown on overhead or roadside variable message signs (VMS). VSL frameworks have been around throughout the previous 30 years and as of now are effectively being utilized and additionally tried in parts of Europe and Australia. VSL frameworks are as of now being utilized as a part of a few states and could be executed in fitting regions over the United States to help conceivably decrease driver blunder and speeds, and to upgrade the security of our roadways using inventive innovation. Periodically, the VSL framework is a piece of a bigger episode administration, blockage administration, climate counseling, or driver cautioning framework. The accompanying pages give cases of past, present and arranged VSL framework applications.

Slide 5

Domestic Examples

Slide 6

Arizona Status: Experimental Objective: to build up a variable speed confine framework that uses "fluffy" control innovation to distinguish speed limits suitable for varying natural conditions. Setting: Simulated - conceivable Field Operational Test on I-40 Size: NA Displayed Speed Logic: The calculation utilizes a "fluffy rationale" arrangement of speed administration. Fluffy rationale is multi-esteemed thinking - basic leadership is neither dark nor white. The idea recreates human thinking forms. Fluffy Logic utilizes loose classifications, or a scope of qualities with cover, to decide the greatest reasonable speed in view of: street surface condition; normal wind speed; wind blast speed; perceivability; level of cross wind; and, precipitation force. The most extreme judicious paces depend on weighted midpoints of these segments, built up by interstate office and state police accomplices as the computation premise. Crisis paces can be set physically. Admonitory/Enforceable/Enforced: NA - Future Study Results: The 1998 program created and assessed model calculation and equipment/comm joins. The 1999, stage II research is being started to refine the calculation, to handle test the framework and correspondences, and to dissect dependability and propriety of the framework's choices. The work by Northern Arizona University on stage II is upheld by the ATLAS Center at the University of Arizona, and additionally by Arizona DOT.

Slide 7

Colorado Status: Active (Dynamic Downhill Truck Speed Warning System Operational Test - started mid-1995) Objective: to recognize vehicle-particular safe working paces for long downsizes to lessen runaway truck mishaps through ongoing driver data to adjust driver conduct Setting: Rural - Eisenhower Tunnel on I-70 west of Denver Size: presently situated inside the Eisenhower Tunnel just before the passage leave comprises of: say something movement sensor variable message sign inductive circle identifiers PC equipment and programming Displayed Speed Logic: The calculation inside the PC framework figures a protected speed in view of the truck weight, speed, and hub setup. The prescribed speed is shown on a variable message sign. Each truck gets a vehicle-particular suggested safe speed message. Consultative/Enforceable/Enforced: Advisory Results: Since framework organization, truck-related mishaps have declined on the lofty downhill review segments while the volume of truck movement has expanded by a normal of 5 percent for each year.

Slide 8

Michigan Status: Inactive (enacted 1962, disassembled at some point after 1967) Objective: to caution drivers to decelerate when moving toward blockage and quicken when leaving clog Setting: Urban – M-10 (John C. Hold up Freeway) in Detroit between the Edsel Ford Freeway (I-94) and the Davison Freeway Size: 5.2 km (3.2 miles) 21 variable speed sign areas Displayed Speed Logic: as far as possible signs were physically exchanged at the control focus. The signs could show speeds in additions of 5 mph from 20 to 60 mph. The speed was picked by the administrator in view of CCTV and pen plots of interstate speed. Consultative/Enforceable/Enforced: Advisory Results: Michigan authorities felt variable speed shows did not essentially increment or reduction vehicle speeds.

Slide 9

Minnesota Status: Demonstration Objective: to make work zone speed constrains on high volume urban turnpikes less demanding to sign and implement Setting: Urban (variable - convenient) Size: Variable - relies on upon size of work zone Displayed Speed Logic: When development laborers are not present, the speed keeps on being 65 mph. At the point when development specialists arrive, an assigned laborer changes as far as possible to 45 mph. Counseling/Enforceable/Enforced: Enforceable Results: This application is at the exhibition arrange. More data ought to be accessible in a year.

Slide 10

Nevada Status: Active Objective: to set speed limits in view of the 85th percentile speed, perceivability and asphalt conditions. Setting: Rural - on Interstate 80 beside a coal-let go control era office in a ravine with a stream. Estimate: four VSL signs - two eastward and two westward perceivability finders speed circles Road Weather Information System (RWIS) climate station there are progress "reduce speed ahead when flashing" blazing signs before the establishment of the VSL signs. These signs can be utilized as a part of conjunction with, or freely of, the VSL signs. Shown Speed Logic: Speed points of confinement are processed utilizing a rationale tree in light of the 85th percentile speed, perceivability (in view of halting sight separation), and asphalt conditions (in view of ice, ice, rain, or dry conditions). The sign is restricted to augmentations of 10 mph. Just the tenths digit can be changed. The framework is remotely controlled - no human intercession. On crisp mornings, the signs stay clear. Admonitory/Enforceable/Enforced: Regulatory and Enforceable Results: The unwavering quality of the perceivability sensor has restricted the operation of this establishment to date.

Slide 11

New Jersey Status: Active (introduced in the late 1960s) Objective: to give early cautioning to drivers of moderate movement or unsafe street conditions Setting: Urban/Rural - New Jersey Turnpike Size: 120 signs more than 148 miles inductive circle indicators gather speed and volume information expansion of climate detecting gear is arranged sooner rather than later Displayed Speed Logic: The posted speed points of confinement depend by and large travel speed and are shown consequently (manual supersede utilized for path terminations and development zones). The posted speed cutoff can be diminished from the ordinary speed restrain (contingent upon the milepost area 65 mph, 55 mph, and 50 mph) in five-mph augmentations, to 30 mph. The posted speed utmost can be diminished for six reasons: crashes; clog; development; ice; snow; and mist. The speed cautioning signs show, "Diminish Speed Ahead" and the purpose behind the speed lessening. Whenever proper, the separation between the notice sign and the start of the blockage is shown on the notice sign. Counseling/Enforceable/Enforced: Enforced Results: The New Jersey Turnpike Authority feels that the signs are compelling. The signs give drivers data on unordinary roadway conditions, which direct the requirement for speed lessening. State Police uphold the decreased speed confines by issuing summonses to those drivers observed to be in infringement.

Slide 12

New Mexico Status: Inactive (initiated 1989, destroyed 1997 because of street extending) Objective: to give a US test bed to VSL hardware and calculations to post speed restrains that reflect movement conditions (to limit mishap chance and inform drivers with respect to dangers) Setting: Urban – I-40 Eastbound in Albuquerque Size: 4.8 km (3miles) 3 variable speed sign areas Displayed Speed Logic: Fully computerized - refreshed each moment Smoothed Average Speed + Environmental Constant Posted rates went from 30-55 mph Also showed least speed restrict Advisory/Enforceable/Enforced: Enforced Results: - Overall, the gear and calculation were a win. - There was a slight decrease in mischances. The adequacy assessment was impeded by high normal paces, sign perceivability, and sun glare. The greatest speed constrain that could be posted was the National Maximum Speed Limit (55 MPH). Since smoothed normal speeds frequently surpassed this most extreme, the capacity of the framework to post speed restricts that reflected movement conditions was prevented.

Slide 13

Oregon Status: Expected to be operational in Spring 2000 (some portion of the "Green Light" Field Operational Test). Target: to exhort truck drivers what speed they ought to go to make it securely down Emigrant Hill, on I-84 amongst Pendleton and La Grande. Setting: Rural - 6 mile long 6% minimize Size: say something movement (WIM) scale roadside variable message sign programmed vehicle ID (AVI) peruser Displayed Speed Logic: Vehicle weight is measured utilizing WIM and the ve

SPONSORS