Handymen start the establishment of funneling - First the channel waste-vent (DWV) ... Family the handymen, circuit testers, and sheet metal specialists return ...

Presentation Transcript

Slide 1

8. Inside FINISHES FOR WOOD LIGHT FRAME CONSTRUCTION

Slide 2

8 .1 INTERIOR FINISHING OPERATIONS FOR WOOD LIGHT FRAME CONSTRUCTIONS - OVERVIEW 8.1 INTERIOR FINISHING OPERATIONS FOR WOOD LIGHT FRAME CONSTRUCTION - OVERVIEW 8.2 INTERIOR FINISHING OPERATIONS 8.3 THERMAL INSULATIONS AND VAPOR RETARDERS 8.4 DESIGN OF FINISH STAIRS

Slide 3

Interior Construction Sequence Interior Partition Framing Rough-in (& Equipment) Code Compliance Inspection Thermal Insulation & Vapor Retarder Building Inspection Ceiling & Wall Materials Interior Millwork, Interior Finishes MPE Fixtures, Devices, Trim, & Appliances

Slide 4

Waste/Vent Piping WC Rough-in Copper Water Piping (joints) Why not PVC? Pipe Insulation

Slide 5

Vent Pipe Plumbing Why "Stack" Plumbing Fixtures? ?

Slide 6

Insulated "Flex" Duct

Slide 7

Insulation Sprinkler Pipe Rare in Residential Construction WHY? Adaptable Duct Anchorage

Slide 8

Round Duct

Slide 9

Square Ductwork

Slide 10

Electrical Roughin

Slide 12

Electrical roughin utilizing adaptable metal conductors

Slide 14

Nail Protectors and Sealant to counteract smoke movement

Slide 15

8.2 INTERIOR FINISHING OPERATIONS After the confining woodworkers and roofers complete the outside material and siding of the stage outline building, they are joined by various building exchange people to finish the expanding within Plumbers start the establishment of channeling - First the deplete squander vent (DWV) funnels (bigger breadth pipe) are introduced since they need the privilege of way - Second the little supply pipes, that bring hot and icy water; and gas channels are laid - If the building is to have a high temp water framework, the handymen put the evaporator and introduce the warming channels and convectors - Then sheet metal specialists introduce the heater and ventilation work for focal warm-air warming or potentially cooling The circuit testers finish the wiring of the working After this "harsh" establishment, investigators from the city building division check each of the introduced frameworks for consistence with the pipes, electrical and sheet metal codes

Slide 16

8.2 INTERIOR FINISHING OPERATIONS (Cont'd) Thereafter, associations are made to the outer wellsprings of water, gas, power and correspondence benefits, and to a method for sewage transfer (to a fundamental sewer or a septic tank and a filtering field) At this point, the general building monitor of the region is called to analyze the encircling, outside completing and protection for consistence to the code arrangements. Any inadequacy found at this stage must be redressed instantly before continuing further. The second period of inside complete operations begin The intricate tangle of 'confining individuals, pipes, channels, wires and protection' quickly vanishes behind the complete divider and roof materials The inside millwork - entryways, complete stairs, railings, cupboards, racks, storage room insides , and entryway and window housings - is introduced by complete woodworkers Finish flooring materials are introduced as late as could be allowed to spare them from harm by the passing multitudes of laborers Finish craftsmen then introduce the baseboards

Slide 17

8.2 INTERIOR FINISHING OPERATIONS (Cont'd) Painters prime, paint, stain, varnish and paper the inside Family the handymen, circuit repairmen, and sheet metal specialists return quickly to introduce the pipes apparatuses, electrical repositories, switches, light apparatuses, air flame broils and registers A last round of examination are done to cure the waiting imperfections Now the building is prepared for inhabitance

Slide 18

8.3 THERMAL INSULATION AND VAPOR RETARDER Thermal protection keeps a building cooler in summer and hotter in winter by hindering the section of warmth through the outside surfaces of the building - Keeps the tenants of the building more agreeable by directing the temperatures of the inside surfaces of the building and lessening convective drafts - Reduces the vitality utilization of the working for warming and cooling, to a small amount of what it would be without protection Thermal protection is any material added to a building get together, with the end goal of abating thee conduction of warmth through the get together

Slide 19

Thermal Insulation Purpose Materials Installation R-Values

Slide 20

Vapor Retarder Outside Wall

Slide 21

8.3 THERMAL INSULATION AND VAPOR RETARDER (Cont'd) 8.3.1 Types of thermally protecting materials: Glass fiber batts (covers) are the most famous sort of protection for divider cavities in new development - Widely utilized as a part of loft and rooftop protection (i) Batt or cover - Glass/shake fleece - R esteem 3.2-3.7 - Incombustible (ii) High thickness batt - Glass fleece - R esteem 4.3 - Incombustible (iii) Loose fill - Glass/shake fleece - R esteem 2.5-3.5 - Incombustible (iv) Loose strands with folios - Treated cellulose, glass fleece - R esteem 3.1-4.0 - Incombustible (v) Foamed set up - Polyurethane - R esteem 5-7 - Combustible (vi) Foamed set up - Polyicynene - R esteem 3.6-4.0 - Combustible yet self- extinguishing (vii) Rigid board - Polystyrene froth R esteem 4-5 - Combustible, however self- extinguishing (viii) Rigid board - glass fiber - R esteem 3.5 - Incombustible (ix) Rigid board - Cane fiber - R esteem 2.5 - Combustible - Low cost

Slide 22

8.3 THERMAL INSULATION AND VAPOR RETARDER (Cont'd) 8.3.2 Increasing Levels of Thermal Insulation: Thicker dividers, protecting sheathing materials and different plans have been created amid the previous a quarter century - Insulation levels can be expanded from R12 of an ordinary stud divider by utilizing either 2x6 encircling and thicker batt protection or 2x4 surrounding with plastic froth sheathing in blend with batt protection - Treated wood establishments can likewise be protected to high R-values - Ceiling protection batts typically should be compacted to fit them into the decreased space under the rooftop sheathing 8.3.3 Radiant Barriers: In hotter areas brilliant boundaries are by and large progressively used to diminish stream of sun oriented warmth into the building - These are thin sheets or boards confronted with a splendid metal thwart that reflects infrared radiation; they are introduced over the rafters or studs and underneath the sheathing - Effective just if the brilliant surface of the obstruction confronts a ventilated airspace. Sun powered warmth that has gone through the external skin of building is expelled by convection; likewise these obstructions are arranged with folds that would naturally give the ventilated airspace - Radiant hindrances are utilized as a part of alongside routine protecting materials to accomplish the coveted general warm execution

Slide 23

8.3 THERMAL INSULATION AND VAPOR RETARDER (Cont'd) 8.3.4 Vapor Retarders: Vapor retarder is a film of metal thwart, plastic, or treated paper set on the warm side of the warm protection to keep water vapor from entering the protection and consolidating into fluid; its part increments in significance as the warm protection levels increment - Many batt protection materials are outfitted with a vapor retarder layer of treated paper or aluminum thwart effectively appended - Designers in icy atmosphere like to utilize unfaced batts and apply a different vapor retarder of polyethylene sheet, since a vapor retarder connected to batts has a crease at every stud that can release noteworthy amounts of air and vapor 8.3.5 Air Infiltration and Ventilation: Much consideration is given to decreasing the air invasion between the inside and outside, since spillage frequently represents the real segment of the fuel smoldered to warm the working in winter - This pattern has brought about houses and condo that trade so little air with the outside prompting to amassing of dampness, scents and substance poisons inside - Hence aerial warmth exchangers have been introduced to recuperate the warmth from the depleted air from the building

Slide 24

Vapor Retarders Purpose Materials Installation

Slide 25

8.3 THERMAL INSULATION AND VAPOR RETARDER (Cont'd) 8.3.6 Airtight Drywall Approach (ADA): As a contrasting option to vapor retarders, water/air proof drywall approach has been utilized as a part of structures - It depends on the presumption that most buildup issues are created by the air spilling out from the inside of the working to outside - Hence if all the inside joints in the gypsum (drywall) board is fixed by utilizing compressible froth gaskets or sealants then air spillage is wiped out - notwithstanding giving great control of water vapor, ADA additionally diminishes warm misfortunes that happen due to air penetration all things considered

Slide 26

Radiant Barriers Used to lessen the stream of sun oriented warmth Thin sheets of boards confronted with metal thwart Reflects infrared radiation Airtight Drywall Approach Reduce/dispose of air penetration Effect: Control the stream of water vapor Reduce warm misfortune (pick up) as a result of air penetration

Slide 27

Gypsum Drywall - stacked

Slide 28

Joint Reinforcing Tape Corner globule Joint Tape Applied Joint Compound

Slide 29

Applying Joint Compound

Slide 30

Wall & Ceiling Finish Plaster Gypsum Drywall Veneer Plaster

Slide 31

Millwork & Finish Carpentry Window Casings Baseboards Cabinets

Slide 32

Flooring & Hard Tiles Floor Preparation Flooring Materials Wall Materials

Slide 33

Floor Underlayment Purpose: Level Floor Increase Fire Resistance Reduce Sound Transmission Materials Poured Gypsum Lightweight Concrete

Slide 34

Flooring & Hard Tiles Floor Preparation Flooring Materials Wall Materials

Slide 35

Finish Flooring Functions & Considerations Functions: Visual Acoustics Wearing Surface Considerations Life/solidness Skid resistance Sanitation Noise Fire (resistance, instability)

Slide 36

Stone Flooring Types Marble Granite Slate Sandstone, … Installation Setting Bed Grouted joints

Slide 37

Marble Flooring

Slide 38

Quarry Tile Fired Clay tile